Quanzhou BCCY New Energy Co., Ltd. initiates construction of the negative-pressure LFG extraction well network, pipeline collection stations, pre-treatment system, and gas engine power units.



What is LFG?
As waste decomposes in a landfill, oxygen-free (anaerobic) conditions cause it to release methane. With a global warming potential at least 28 times greater than CO2 and a short (12-year) atmospheric life, methane is a potent greenhouse gas that is a key contributor to global climate change. Landfill gas (LFG) projects capture this methane at the source, avoiding emissions either by combusting it directly or converting it into energy.
Project Summary
The project is located at the Shizaiqian Municipal Solid Waste (MSW) Landfill Site in Luojiang District, Quanzhou City, Fujian Province, China. Constructed and operated by Quanzhou BCCY New Energy Co., Ltd., the facility features a comprehensive LFG extraction and treatment network connected to five 1 MW gas engine generator sets (5 MW total rated capacity). The system collects methane generated from decomposing organic waste and converts it into grid-connected electricity, delivering both environmental protection and regional clean power.
Follow the latest milestones and updates from this project.
Quanzhou BCCY New Energy Co., Ltd. initiates construction of the negative-pressure LFG extraction well network, pipeline collection stations, pre-treatment system, and gas engine power units.
Verra completes its technical review and formally approves the verification request for MP3, enabling the issuance of Verified Carbon Units (VCUs) for the period.
CTI Certification Co., Ltd. issues the final VCS Verification Report confirming full compliance with monitoring plans, metering calibrations, and emission calculations.
On-site stakeholder meetings are conducted with local villagers, landfill management, and plant operators. Community members confirm air quality improvements and review noise monitoring results and local hiring commitments
The plant supplies 26,186.95 MWh of electricity to the grid and avoids 146,135 tCO₂e in greenhouse gas emissions, bringing total cumulative avoided emissions to 567,185 tCO₂e over four operating years
Independent auditor LGAI Technological Center, S.A. (Applus+ Certification) completes project validation, approving the VCS Project Description (v04.0) under methodology ACM0001 (v19.0).
Over its third operating year, the facility exports 27,420.43 MWh of clean energy and achieves 153,003 tCO₂e of emission reductions. Formal verification is completed by CTI Certification Co., Ltd. on Nov 01, 2022.
Commercial operations launch with four operational 1 MW gas engines (4 MW active capacity out of 5 MW total design capacity). This date marks the official start of the 10-year fixed VCS crediting period running through Jun 30, 2029.
The plant exports 53,460.82 MWh of electricity to the Eastern China Power Grid (ECPG) and achieves 268,047 tCO₂e in verified GHG emission reductions over its first two operating years.
A formal local stakeholder consultation meeting and questionnaire survey are conducted at the landfill site. All 25 surveyed residents express support for the project, and developers establish proactive noise-mitigation and local employment commitments.
Fujian Huanan Environmental Assessment and Testing Co., Ltd. completes the Environmental Impact Assessment (EIA). The Environment Protection Bureau of Quanzhou City formally approves the project, confirming no significant negative impacts on local environmental media.
The Shizaiqian MSW landfill site begins accepting municipal waste in Luojiang District, Quanzhou City, Fujian Province. The site is designed with an effective waste capacity of 3,900,000 m³ and a daily processing capacity of 810 tonnes.
Prevents atmospheric release of methane and displaces grid electricity dominated by fossil fuels, achieving 268,047 tCO₂e of avoided emissions in its first two years and an estimated 687,053 tCO₂e across its 10-year crediting period.
These Sustainable Development Goals show the wider outcomes this project supports beyond its headline impact.
Supplies clean, renewable electricity to the Eastern China Power Grid (ECPG) from recovered landfill gas, supplementing local municipal energy needs.
Created 5 permanent full-time operational jobs through Quanzhou BCCY New Energy Co., Ltd. for project operations and environmental monitoring.
Prevented the release of 268,047 tonnes of CO₂ equivalent into the atmosphere during its initial reporting period through active methane destruction and fossil fuel displacement.
These partners help deliver the project and verify its impact.
The Verified Carbon Standard (VCS) Program is the world's most widely used greenhouse gas (GHG) crediting program.